Specifications
Certification :
CE
Place of Origin :
China
MOQ :
1
Payment Terms :
Western Union,T/T
Delivery Time :
15 days
Packaging Details :
Wooden Crate
Price :
USD28-68889
Description
Industrial WTP Control Panel SCADA Integrated for Water Treatment Plant Automation
Product Description
End-to-End Intelligent Control
  • Industrial-grade PLCs (Siemens/Rockwell) for automated coagulation-sedimentation-filtration-disinfection processes
  • Integrated SCADA system supporting remote start/stop, parameter adjustment, and diagnostics (compatible with WinCC, Ignition, etc.)
Multi-Parameter Water Quality Monitoring
  • Real-time tracking of 12 critical parameters (pH/turbidity/residual chlorine/COD) with Hach/Endress+Hauser sensors
  • Smart dosing algorithms: Automatic PAC/chlorine adjustment (15-30% energy savings)
High-Reliability Design
  • Dual-power auto-switching (grid + generator) + redundant critical components (PLC/communication modules)
  • IP65 stainless steel enclosure (304/316L options) for coastal salt spray environments
Smart Water Management
  • 4G/fiber dual-channel data transmission to cloud platforms (Aliyun/Huawei Cloud)
  • Mobile APP alerts (WeChat/SMS/email three-tier warnings)
Typical Applications
Industry Control Requirements Customization Cases
Municipal WWTP Precise aeration control for AAO process DO PID optimization + blower energy-saving linkage
Industrial Wastewater Heavy metal removal in electroplating effluent ORP-controlled electrolysis + online sludge concentration monitoring
Seawater Desalination RO membrane pressure protection High/low-pressure pump VFD coordination + fouling prediction model
Rural Drinking Water Integrated purification equipment management Solar-powered + BeiDou satellite communication (off-grid areas)
Food Plant Reuse Water UV disinfection systems UV intensity monitoring + auto-c
Send your message to this supplier
Send Now

Industrial WTP Control Panel SCADA Integrated For Water Treatment Plant Automation

Ask Latest Price
Certification :
CE
Place of Origin :
China
MOQ :
1
Payment Terms :
Western Union,T/T
Delivery Time :
15 days
Packaging Details :
Wooden Crate
Contact Supplier
Industrial WTP Control Panel SCADA Integrated For Water Treatment Plant Automation
Industrial WTP Control Panel SCADA Integrated For Water Treatment Plant Automation
Industrial WTP Control Panel SCADA Integrated For Water Treatment Plant Automation
Industrial WTP Control Panel SCADA Integrated For Water Treatment Plant Automation

Guangzhou Hengmeida Automation Technology Co., Ltd

Verified Supplier
1 Years
guangzhou
Since 2019
Business Type :
Manufacturer
Total Annual :
>5000000
Employee Number :
50~100
Certification Level :
Verified Supplier
Contact Supplier
Submit Requirement