Precision Steel Castings High Strength Tensile Structural Tie Rods
Production Details
|
Tolerance
|
ISO8062 CT6-CT8
|
|
Surface Treatment
|
Electroplating, Chrome plating, Zinc plating, Nickel plating, Electrophoresis, Polishing, Sandblasting, Passivation, Powder coating, Spray painting, hot dip zinc coating, Etc.
|
|
Quality Assurance
|
ISO9001, IATF16949
|
|
Inspection
|
1.Foundry in-house: 100% inspection on critical dimension; 100% on appearance
|
|
2.Third Party inspection available upon requirement
|
|
Main Testing Facility
|
Three-dimensional measuring instrument(CMM),Salt spray test box, Dynamic balance detector, Pneumatic detection, Mechanical properties test machines, Nondestructive test equipments.
|
|
Features & Advantage
|
1.High strength and not easy to deform, has good electrical and thermal conductivity
|
|
2.High finish appearance,smooth surface roughness is Ra1.6 after machining
|
|
3.No granules, no spots and no surface coating peel off in appearance
|
|
4.Good corrosion resistance
|
Production Process

About Us
Sunrise Foundry is a professional Metal Foundry, located in Ningbo. We have been producing Gray Iron,
Ductile Iron Castings and and any other precision castings for more than 25 years.
We are dedicated to meet different requirements of various customers across the world, products are mainly
involved Agricultural and Construction Machinery, Hydraulic, Mining industry, Municipal Products, some steel
and stainless steel castings for Pumps and Valves, Pipe Fittings, etc.
Please feel free to contact us if you have any requests.
Quality Control

FAQ
1.How can I get the quotation?
Please give us your drawing,quantity,weight and material of the product.
2.If you don't have the drawing,can you make drawing for me?
Yes,we are able to make the drawing of your sample duplicate the sample.
3.When can I get the sample and your main order time?
Sample time: 35-40 days after start to make mold. Order time: 35-40 days, the accurate time depends on product.
4.What is your payment method?
Tooling:100% T/T advanced Order time:50% deposit,50%to be paid before shipment.