Grey Iron Base with Customized Color and Custom Dimensions for Parking Garage Guard Rails
Product Details

Production Process

Quality Control

FAQ
1: What information does the quotation need?
Pls. offer your drawings and/or samples, quantity and packing’s requirements.
Drawings in PDF, IGS, DWG, STEP, MAX are suitable to us.
2: What’s lead time for samples and products?
Lead time for samples: 30-70days depend on the structure of the part and other requirements on heat treatment, machining, surface
treatment and so on.
Mass production lead time: 35-70days depend on products’ characteristics and quantity.
3: What is the requirement on payment?
Tooling Cost:100% T/T advanced
Payment for the Order:50% deposit,50% to be paid before shipment.