Investment Casting Bracket Support Railway Part
Product Detail
Material | Stainless Steel : Austenite Series (SUS304,SUS316...) Martensite Series(SUS410,SUS420,420J2...) Type of Precipitation Hardening (17-4PH...) Alloy Steel : Carton Steel,Low Alloy Steel (Mo-Cr Steel,Ni-Cr-Mo Alloy) Tool Steel : SKD,SKS,SKH... Carbon Steel : #45, #20,#q235, #a3... Other : AI-Alloy, Copper Alloy,Low Alloy,Bearing Steel,Heat-Resisting Steel, Cobait Based Alloys,Fe-Si Alloy,Bronze,Aluminum... |
Processing Craft | Drawings→ mould making → casting →rough machining → CNC machining→surface treatment →product checking→ packing →delivery |
Tolerance | 0-10 ±0.25 ±0.15 11-25 ±0.40 ±0.2 25-50 ±0.75 ±0.3 |
Surface Treatment | Electroplating, Chrome Plating, Zinc Plating, Nickel plating, Electrophoresis, Anodization, Polishing, Sandblasting, Passivation, Powder coating, Spray painting, Etc. |
Quality Guarantee | Two years |
Inspection | Three-dimensional measuring instrument (CMM), Salt spray test box, Dynamic balance detector, Pneumatic detection |
Features & Advantage | 1.High machining accuracy, the flatness within 0.1mm. 2.High strength and not easy to deform, has good electrical and thermal conductivity. 3.High finish appearance,smooth surface roughness is Ra1.6 after machining. 4.The machining precision is high and the assembly structure is seamless. 5.No granules, no spots and no painting peel off in appearance. 6.Smooth appearance, corrosion resistance. |
Application | 3C industry, lighting decoration, electrical appliances, auto parts, furniture parts, electric tool, medical equipment, intelligent automation equipment,other metal casting parts. |
Production Process

Quality Control

Why Choose Us
1. Advance equipment and professional factory.
2. Good Service: We treat clients as friend.
3. Good Quality: We have strict quality control system.
4. OEM Accepted: We can produce any your design.
FAQ
Q: How about the lead time?
Mould: 15-20 calender days.
Mass production:20 calender days.
Q:How long will it take for quotation?
We will quote within 2 working days after receiving detail information.
Q: What is your Minimum of quantity(MOQ)?
MOQ is 100 kilograms.