Automatic Industrial Glove Making Equipment CNC Controlled
ZHIHUI A.I. Automatic Gloves Dipping Machine is a fully integrated production line designed for the manufacturing of nitrile/latex/PU/PVC/Sandy/Micro Foam coated gloves. Equipped with DELTA PLC automation, 304 stainless steel dipping tanks, auto-feeding with level sensors, and heavy-duty driving chains, this system delivers precise loading, dipping, drying, stripping and packing with minimal operator intervention.
Technical Specifications
| Parameter |
Value |
| Line Dimensions (L*W*H) |
65m * 2.5m * 4.7m (frame only, excl. blower height) |
| Daily Throughput |
20,000-30,000 pairs |
| Cycle Duration |
25-45 seconds |
| Installed Power |
50 kW |
| Power Input |
3*380V + N / 50Hz |
| Compressed Air Supply |
0.5-0.8 MPa |
| Control Architecture |
Delta PLC |
| Heating Energy |
Natural Gas |
| Heating Medium |
Thermal oil (320#) + Blower hot air |
| Crew Required |
3-4 operators per shift |
Seven-Stage Dipping Process
| Stage |
Tank |
Function |
| 1 |
Coagulant-1 |
Primary coagulant |
| 2 |
Compound Dip-1 |
First-layer latex/NBR coating |
| 3 |
Foam |
Foam-layer application |
| 4 |
Crinkle |
Crinkle texture formation |
| 5 |
Coagulant-2 |
Secondary coagulant |
| 6 |
Compound Dip-2 |
Second-layer coating |
| 7 |
Sandy |
Sandy/grip finish |
Core Differentiators
- 7-Tank Versatility - Produce NBR, latex, foam, crinkle, and sandy gloves on one line
- Dual Heating System - Thermal oil + forced hot air for precise temperature profiling
- Universal Mould Compatibility - Palm, half, and full dip from the same mould set
- PLC Control - Automation with temperature regulation
- End-to-End Formula Room - From raw material milling to viscosity measurement, fully equipped pipelines with DN65 temperature control valves (10 units), cast steel gate valves, elbows, flanges, and insulation materials
After-Sales & Technical Support
| Phase |
Coverage |
| Warranty |
12 months from commissioning |
| Remote Diagnostics |
Complimentary video-assisted troubleshooting |
| On-Site (Warranty Period) |
Spare parts + labor: ZHIHUI covers; travel & accommodation: Buyer covers |
| On-Site (Post-Warranty) |
All costs (parts, labor, travel, accommodation): Buyer covers |
| Installation Team |
2 technicians (mechanical + electrical), 30-40 working days |
| Formula Support |
Optional expert dispatch |