Professional Installation Process for Demountable Partition Walls
Demountable partition walls offer flexibility, speed, and precision in space division—whether for offices, co-working spaces, or commercial interiors. Our streamlined installation process ensures seamless assembly, structural integrity, and a flawless finish.
Step-by-Step Installation Guide
| 1. Planning & Design | ✔ Space Assessment | Measure floor plans, ceiling height, and load-bearing requirements |
| ✔ Custom Layouts | Optimize wall placement for privacy, acoustics, and traffic flow |
| ✔ Material Selection | Choose glass, aluminum, or hybrid panel systems |
| 2. Site Preparation | Floor & Ceiling Inspection | Ensure level surfaces (±2mm tolerance) |
| Clearance & Safety | Remove obstacles, mark electrical/plumbing zones |
| Modular Grid Mapping | Laser-guided alignment for track positioning |
| 3. Track Installation | Heavy-Duty Aluminum Channels | Anchored to ceiling/floor with seismic-rated brackets |
| Precision Leveling | Adjustable shims compensate for uneven surfaces |
| Load Testing | Verified to support 200kg/m² vertical loads |

| 4. Panel Assembly | ✔ Pre-Assembled Modules | Glass or solid panels slide into tracks (no welding/gluing) |
| ✔ Acoustic Seals | Silicone gaskets reduce sound transmission by 5-8dB |
| ✔ Tool-Free Adjustments | Cam-lock system enables millimeter-perfect alignment |
| 5. System Integration | Doors & Operable Walls | Pivot/sliding doors installed with auto-latching hardware |
| Cable Management | Integrated wire channels for power/data |
| Hybrid Attachments | Compatible with whiteboards, shelving, or green walls |
| 6. Quality Assurance | Laser Alignment Check | Ensures walls are plumb (±1.5mm variance) |
| Operational Testing | Doors, moving parts, and acoustic seals verified |
| Client Walkthrough | Final inspection with sign-off protocol |

Installation steps
- Paetition up the celling
- Wall starter installation
- Celling connection installation
- Bottom connection installation
- Conner pole installation
- Horizontal panel
- Vertical panel
- Bind panel
Wall starter installation & vertical adjustment
Regulate the vertical adjusting pole tothe vertical position by the M8*30bolt,and fix it with the side groove byself-tapping screw
Top and bottom groove installation&vertical
Vertical adjusting pole should be samecenter line with top and bottom groove
- Corner pole installation
- Horizontal panels connection
- Vertical panels connection
- Blind installation

Each model has a different installation method. We'll provide detailed instructions in PDF format and a video tutorial.