Foundation
Trenching: Length: (length of Road blocker + 0.4) m,
Width: 1.4 m
Depth:(0.76 + panel thickness + 0.2) m
Reservoir tank based on local situation (or connected with city drainage pipe)
Use C30+ leve/ concrete to make a 200 mm cushion and bury PVC drain pipe in it.
| Control System | Electro- Hydraulic |
| System Dynamic power | 3.75KW |
| Rise time : | ≤1-3S(adjustable) |
| fall time : | ≤1-3S (adjustable) |
| Buffer function | buffer time :0.2s-0.5s |
| Running noise | ≤60 db |
| Voltage: | Three-phases 380V,(control voltage 24V) |
| Oil container: | 60liter |
| Control solenoid valve | 24V |
| Lifting solenoid valve | 24V |
| Remote control distance | Approx .50-100m |
| Working Temperature : | -35ºC~75ºC(suitable) |
| Material: | 304 stainless steel ,Spray anti-rust paint |
| Material thickness | 16mm,20 mm,25 mm (Optional) |
| Waterproof: | IP68, double sealed |
| LED light color | red,blue,green,yellow,purple,white…(customized) |
| Color: | red,blue,green,yellow…(can be customized) |
| Weight: | 1.5T |







