Description:
Will silicon carbide replace silicon in the future?
The application fields of third-generation semiconductor materials and traditional silicon materials are completely different. Silicon is more used to make traditional integrated circuit chips such as memory, processors, digital circuits and analog circuits. Because silicon carbide can withstand high voltage and high current, it is particularly suitable for manufacturing high-power devices, microwave radio frequency devices, and optoelectronic devices.
Especially in the field of power semiconductors, after the cost of silicon carbide decreases in the future, it will replace silicon-based MOSFET IGBT and other devices to a certain extent. However, silicon carbide will not be used to make digital chips. The two are complementary. In some power device fields, silicon carbide chips will have an advantage in the future.
Specifications:
Black Silicon Carbide powder Content for Concretion Grinder | ||||
Brand | Grit Size | Chemical Composition(%) | ||
SIC(min) | F.C(max) | Fe2O3(max) | ||
Black silicon carbide | F12-F90 | 98.5 | 0.20 | 0.60 |
F100-F150 | 98.5 | 0.30 | 0.80 | |
F180-F220 | 97.0 | 0.30 | 1.20 | |
Black Silicon Carbide powder Content for Coating Grinder | ||||
Brand | Grit Size | Chemical Composition(%) | ||
SIC(min) | F.C(max) | Fe2O3(max) | ||
C-P | P12-P100 | 98.0 | 0.25 | 0.70 |
P120-P150 | 97.5 | 0.35 | 0.90 | |
P180-P220 | 96.0 | 0.35 | 1.35 |
Packing & Delivery
Packing: 1 ton big bag, 20-25mt in 20' container
FAQ:
Q : How can you control your quality?
A : For each production processing, ZhenAn have complete QC system for the chemical composition and Physical properties. After production, all the goods will be tested, and the quality certificate will be shipped along with goods.
Q: Are you a manufacture or trader?
A: Both, we not only can provide the high quality products with the best price, but also can offer the best pre-sale service and after-service.
Q : Do you provide free samples?
A : Of course, free samples are available.
Q: What is your lead time?
A : It usually needs about 15- 20 days after receiving the PO.