Single Span PE Shade Net Tunnel Blackout Greenhouses for Shiitake & Oyster & White Button Mushrooms
Specialized blackout greenhouse solution designed for optimal mushroom cultivation, featuring advanced light control and climate management systems.
Technical Specifications
| Specification |
Details |
| Model |
WL8132 |
| Product Name |
Shade Net Tunnel Blackout Greenhouses for Shiitake & Oyster Mushroom & White Button Mushroom |
| Brand |
IGREEN |
| Origin |
Fujian, China |
| Greenhouse Type |
Single-span agricultural greenhouse |
| Covering Film Type |
Black & white film + heat insulation blanket + transparent film |
| Covering Film Thickness |
150/200 micron plastic film |
| Greenhouse Structure Material |
275gsm zinc coating hot dipped galvanized steel pipe |
| Roof Vent |
Customized |
| Tunnel Width |
7-10m |
| Length |
Customized |
| Shoulder Height |
1.8-3m |
| Roof Height |
3.5-6m |
| Pipe Size |
25/32/48/60mm |
| Column Space |
1/1.5/2/3 meter |
| MOQ |
300sqm |
Frequently Asked Questions
Are you factory or trading company?
We are manufacturer of greenhouse + hydroponics system + fish growing system.
How could I get a sample?
Before we receive the first order, please afford the sample cost and express fee. We will return the sample cost back to you within your first order.
We have a piece of land, but don't know how to make layout of the greenhouse or fish growing system, can you help us make a design?
Yes, please send the size of your land, how many square meter greenhouse you are going to build, and tell us your climate information. Our engineer will make a design according to your request.
I am going to build XXX square meter greenhouse and grow tomato/cucumber/chilli/pepper etc, can you help me calculate how much I can earn in one year?
No problem, just tell me the wholesale price of XXX, then we will calculate the average yield and tell you the amount of earnings.
How long is your delivery time?
Usually it is 20-30 days after order.
How to install the greenhouse/hydroponics/RAS/solar system? Do you provide installation service?
We will provide paper or video building manual, or if needed we will send engineer to do installation guidance.
What preparations should I make before installation?
First get the building permit from the government if required. Second prepare the tools as per the tool list we send to you. Third prepare the workers. Fourth prepare the power supply if needed. Fifth prepare one place that can store the cargo after arrival to protect it from rain.