180kN Jerry Can Blow Molding Machine for PP/HDPE 5L Containers
Automatic HDPE/PP 5L Jerry Can & Engine Oil Bottle Blow Molding Machine with Mitsubishi PLC AC80-20L control system.
Technical Specifications
| Specification |
Value |
| Voltage |
380V |
| Clamping Force |
180 kN |
| Output Capacity |
40 kg/h |
| Plastic Materials Processed |
PP, HDPE, PET, PE/PP, HDPE/PP |
| Automation |
Automatic |
| Power Consumption |
35 kW |
| Machine Weight |
1.5 tons |
| Warranty |
1 Year |
| PLC Brand |
Mitsubishi |
| Screw L/D Ratio |
75 |
| Screw Diameter |
75 mm |
| Number of Screw Heating Zones |
5 |
| Screw Heating Power |
9 kW |
| Extruder Motor Power |
7.5 kW |
| Mold Platen Size (Width) |
120 mm |
| Mold Platen Size (Height) |
250 mm |
| Air Pressure |
0.8 MPa |
| Air Consumption |
0.6 m³/min |
| Die Head Heating Power |
17 kW |
| Machine Dimensions (L×W×H) |
3400 × 1600 × 1800 mm |
Key Features
- Long Service Life with robust construction
- Easy to Operate with intuitive controls
- Mitsubishi PLC for reliable automation
- High efficiency with 40 kg/h output capacity
- Versatile material compatibility (PP, HDPE, PET)
- Comprehensive quality testing and reporting
Manufacturer Profile
Zhangjiagang Anco Machinery Equipment Co., Ltd., established in 2008 and headquartered in Zhangjiagang City, Jiangsu Province, is an enterprise that integrates research and development, production, sales, and service. Specializing in plastic molding equipment, we are committed to providing efficient, energy-saving, and intelligent extrusion blow molding machines to global customers, helping them achieve dual improvements in production efficiency and product quality.
Our innovation-driven development features modular design supporting rapid mold change and flexible production to meet diverse customer needs. Strict quality control and full process digital testing ensure equipment stability and industry-leading lifespan. We provide 24-hour response, technical training, and spare parts supply worldwide.
Frequently Asked Questions
Can your machine meet our specific production needs?
Yes, we provide customized proposals based on your specific requirements. Each machine is tailored to satisfy customer needs effectively.
How long does shipment take after order confirmation?
Typically 30-40 days after confirmation. We also have some machines in stock that can be ready for shipment within 7 days.
What documentation and verification do you provide before final payment?
We provide machine photos, operational videos, and if you have molds, we conduct testing and send samples. You're welcome to visit our factory for inspection or authorize a third-party inspection organization.
What warranty and support do you offer?
We provide a 1-year guarantee with lifetime technical support to ensure your machine operates optimally.
How is machine installation handled?
We send our engineers to your factory to install the machines and provide comprehensive training for your staff on machine operation.