16-20 Meters Three-Section Demolition Long Boom for Excavators
ZX250 ZX260 ZX330 for Construction Machine

- A high reach demolition boom adds a middle arm to the two-section demolition boom, increasing the working safety distance. It typically equipped with a breaker hammer or a hydraulic shear for high building demolition projects.
- High reach deomolition armwill boring after welding , the accuracy is high precision as the original arm to prolong it service life.



Specification

Standard Configuration | 1. Boom, arm and middle arm |
| 2. Linkage assembly*1 kit |
| 3. Bucket cylinder (22 ton type)*1 |
| 4. High pressure hoses*18 |
| 5. Pins*8 |
| 6. Stop valves*10 |
| 7. Lubrication hoses*5 |
| 8. Counterweight optional |










ZHONGHE triple quality control system
The first system is the technical design drawing review mechanism,
The second system is the semi-finished product review mechanism, (each process has a detection testing for the previous process)
The third system is the finished product testing.
(Before painting, the overall inspection is carried out to check whether the design size matches the welding size, and whether
the installation size meets the design requirement.)
To sum up, every single ZHONGHE product has been passed the above three-stage inspection system to ensure
that is qualified before shipping.







Bubble bag packaging for most products, Wooden case for little products, like buckets
Iron frame support for boom arms.
The accessaries and package of excavator long boom arm are subjected to our final confirmation.