Specifications
Technique :
Casting And Heat Treatment
Delivery Time :
7-15Days
Specification :
As customer requestment
Brand Name :
ZTMC
Place of Origin :
CHINA
Manufacturer :
OEM or aftermarket manufacturers
Certification :
ISO9001
Type :
Excavator Undercarriage part
Supply Ability :
10000PCS/Months
Packing :
Wooden Case
MOQ :
1PCS
Finish :
Smooth
Payment Terms :
T/T,L/C
Price :
US$19-34
Surfacetreatment :
Heat treated and hardened
Model Number :
EX220-3、EX220LC-3、EX200-2/3/5、EX230-5
Collor :
Black Yellow And Customer Required
Certifiion :
ISO\CE
Featurse :
Durable
Marketing Type :
Ordinary Product
Packaging Details :
Standard Export Packaging
Standard :
ISO
Description
EX220-3 Top Roller | OEM Direct Replacement, Part No.9062407
Product Overview

This carrier top roller is a 1:1 OEM direct replacement for EX220-3 excavator, matched with official part number 9062407. It fits original mounting holes and assembly dimensions perfectly without any cutting, drilling or on-site secondary modification. This undercarriage spare part stabilizes track operation and solves common walking failures for long-running EX220-3 excavator fleets.

Item Specification
OEM Part Number 9062407
Applicable Excavator Model EX220-3
Machining Tolerance ±0.01mm CNC ultra-precision machining
Heat Treatment Process Overall quenching + stress relief tempering
Applicable Working Scenarios Muddy construction site, gravel quarry, road renovation, rough earthmoving terrain
Installation Type Plug-and-play OEM direct replacement
Applicable Working Environments

EX220-3 excavators are widely used in medium earthmoving projects, quarry exploitation, municipal road reconstruction and wet muddy job sites. Long-term abrasive gravel friction, muddy water erosion and continuous walking impact will cause ordinary aftermarket top rollers to suffer track vibration, track sagging, shaft stuck and premature seal oil leakage. This heavy-duty top roller is professionally manufactured to adapt to these harsh working conditions.

Core Production & Heat Treatment Process

Adopt one-piece integrated forging steel blank to enhance overall structural strength and impact resistance. Standard dual heat treatment technology is adopted: integral quenching improves surface hardness to resist long-term gravel wear; follow-up tempering eliminates internal residual stress to prevent roller shell cracking under frequent impact. All mounting holes and matching contact surfaces are processed by high-precision CNC machines, with machining error strictly controlled within 0.01mm, fully consistent with original factory OEM standards.

On-site Installation Steps
  1. Raise the excavator track with a hydraulic jack to separate track from ground and release partial track tension
  2. Remove fixing bolts of the old top roller, take out damaged roller and clean dust and sediment on the mounting base
  3. Place the new top roller in original position, align reserved bolt holes accurately
  4. Lock all fixing bolts with standard torque, reset track tension and conduct track idle running test
  5. Check no abnormal vibration or friction noise to complete installation
Optimized Operation Advantages
  • Accurate original size matching avoids track deviation and walking shaking
  • Reinforced floating seal system blocks muddy water and dust intrusion to prevent oil leakage
  • Complete heat treatment effectively reduces roller shell fracture risk under heavy impact
  • Direct bolt-on installation greatly shortens on-site maintenance time and labor cost
Real Customer Cooperation Case

A Southeast Asian machinery maintenance company maintains batches of EX220-3 old-model excavators. Previously adopted generic top rollers failed within 700-830 working hours due to incomplete heat treatment and poor machining accuracy. After switching to our OEM-spec top rollers, all parts run stably over 1800 working hours without oil leakage or shell damage, cutting annual undercarriage maintenance cost by 33%.

Frequently Asked Questions
Q1: Is this roller perfectly compatible with EX220-3?
A: Yes, part number 9062407 fully matches original factory drawing and installation size, no gasket adjustment or hole drilling needed.
Q2: What is the advantage compared with cheap aftermarket rollers?
A: Most low-cost rollers skip tempering process with tolerance over 0.05mm. Our full dual heat treatment and 0.01mm precise processing bring longer service life in harsh construction sites.
Q3: Can you provide quality inspection reports for bulk orders?
A: Yes, we can provide professional heat treatment test reports and dimensional inspection reports for all wholesale bulk orders.
EX220-3 OEM Direct Replacement Top Roller with Heat Treated Hardened Construction and CNC Ultra-Precision Machining EX220-3 OEM Direct Replacement Top Roller with Heat Treated Hardened Construction and CNC Ultra-Precision Machining
Send your message to this supplier
Send Now

EX220-3 OEM Direct Replacement Top Roller with Heat Treated Hardened Construction and CNC Ultra-Precision Machining

Ask Latest Price
Technique :
Casting And Heat Treatment
Delivery Time :
7-15Days
Specification :
As customer requestment
Brand Name :
ZTMC
Place of Origin :
CHINA
Manufacturer :
OEM or aftermarket manufacturers
Contact Supplier
EX220-3 OEM Direct Replacement Top Roller with Heat Treated Hardened Construction and CNC Ultra-Precision Machining
EX220-3 OEM Direct Replacement Top Roller with Heat Treated Hardened Construction and CNC Ultra-Precision Machining
EX220-3 OEM Direct Replacement Top Roller with Heat Treated Hardened Construction and CNC Ultra-Precision Machining
EX220-3 OEM Direct Replacement Top Roller with Heat Treated Hardened Construction and CNC Ultra-Precision Machining

Nan'an Zhongte Engineering Machinery Factory

Verified Supplier
2 Years
fujian, quanzhou
Since 2015
Business Type :
Manufacturer, Exporter
Total Annual :
5000000-8000000
Employee Number :
100~120
Certification Level :
Verified Supplier
Contact Supplier
Submit Requirement