DX340 DX370 JMF250 Swing Motor Cover K9002105 K1007543 For Doosan
Compatible Models
| EC Series |
Bulldozer Series |
| EC55BLC EC60 EC130 EC140B EC210B EC240B EC290B EC330 EC360 EC460B |
D20 D30 D31 D3B D3C D3D D40-1 D4C D4D D4H D5 D50 D5B D5H D5M D6B D6C D6D D6H D6R D65 D7 D7E D7F D7G D7R D80 D85-12 D85-18 D8L D8G D8H D8K D8N D8R D9L D9N D155 D155A-1 D155AX D275 D355 D355A-3 D375-2/3 |
Customization Services
We also design and produce products according to customers' specific requirements.
Installation Procedure
Replacing the swing motor of a Doosan excavator requires expertise and proper procedure. Follow these general steps:
- Preparation: Ensure excavator is in safe state, shut down and unplug all power. Prepare required tools and equipment.
- Remove the Swing Motor:
- Support and fix the swing platform using mechanical or hydraulic means
- Remove pipes and wires connected to the swing motor
- Remove bolts fixing the swing motor using appropriate tools
- Carefully remove the old swing motor
- Install New Swing Motor:
- Place new swing motor in correct position
- Fix bolts to ensure secure installation
- Connect pipes and wires correctly and firmly
- Testing and Debugging: Test new swing motor operation before restarting, including swing speed and direction control
- System Check: Check entire hydraulic system for leaks and anomalies, ensure surrounding components are unaffected
- Record Information: Document replacement date, model, and details for future maintenance tracking
Note: Always follow specific model maintenance manual. Seek professional technical assistance if uncertain.
About Xinfeng Machinery (XF) Parts
Packaging and Delivery
Packing Details
Neutral carton or according to customer requirements, export standard carton. All cartons carefully packed onto pallets. All products undergo thorough QC inspection before delivery.
Delivery Time
Extensive inventory available for complete pumps, motors, and spare parts:
- In-stock items: Delivery within 3 days
- Out-of-stock items (less than 50pcs): Delivery within 5 days
- Larger quantities receive more favorable pricing
Minimum Order Quantity
No MOQ for common models or stocked productions.
Delivery Methods
- Courier (DHL, UPS, FedEx): Door-to-door delivery, 5-7 days
- Air Freight: To airport, 3-5 days
- Sea Freight: To seaport, 20-30 days