Specifications
Brand Name :
RM
Model Number :
F128
Certification :
ISO9001/ISO45001/ISO14001,TUV
Place of Origin :
HENAN,CHINA
MOQ :
1 UNIT
Payment Terms :
T/T
Supply Ability :
5 UNIT/30 DAYS
Delivery Time :
30-45 WORK DAYS
Packaging Details :
WOODEN PACKING
Product name :
Fuse Training System
Function :
educational training equipment
Application :
educational training equipment,School Classroom
Type :
Electrical and electronic basis examination&training equipment series
Size :
1600mm*680mm*1600mm
Item name :
Primary electrical lighting skills assessment training device
Usage :
Education School Sensor Experiment,Power Research
Training bench :
lab equipment for school
Category :
Power training equipment
End user :
Professional School,Secondary School
Description
I. Technical Performance Parameters
  1. Input power supply: Three-phase four-wire (or three-phase five-wire) ~380V±10% 50Hz
  2. Power supply output: Equipped with leakage protector, overload and short-circuit protection devices.
  3. Three-phase four-wire 380V output with output voltage indicated by three voltmeters
  4. ~220V output through safety sockets
  5. +24V/2A DC regulated power supply output
  6. +5V/1A DC regulated power supply output
  7. ±12V/1A DC regulated power supply output
  8. DC voltage: 0~10V adjustable output; DC current: 0~20mA adjustable output
  9. Working environment: Temperature -10℃~+40℃, Relative humidity <85% (25℃), Altitude <400m
  10. Device capacity: <1.5KVA
  11. Weight: <110Kg
  12. Overall dimensions: Not less than 1600mm*680mm*1600mm
  13. Safety protection: Equipped with leakage current protection device, in compliance with national safety standards
III. Basic Configuration and Functional Parameters of the Training Device

The training device consists of a control panel, a training desk, a host training module, training units (including a wealth of simulated training objects of industrial field equipment), a frequency converter hanging box, a touch screen hanging box, etc.

(I) Training Desk
  1. The frame of the training desk adopts an industrial aluminum profile structure, and the tabletop is a fireproof, waterproof and wear-resistant high-density board; it adopts an integrated design of computer desk and training desk. The lower part of the training desk is equipped with a drawer cabinet, a computer host cabinet, a keyboard tray, etc., with a firm structure and an elegant appearance. The overall dimensions are approximately 1600mm*680mm*1600mm.
(II) Control Panel Parameters
  1. Input power supply: Three-phase four-wire (or three-phase five-wire) ~380V±10% 50Hz.
  2. AC power supply output: Three-phase four-wire 380V output with output voltage indicated by three voltmeters, equipped with leakage protector, overload and short-circuit protection devices.
  3. ~220V output through safety sockets.
  4. DC power supply output
    • (1) +24V/2A DC regulated power supply output;
    • (2) ±12V/1A DC regulated power supply output;
    • (3) +5V/1A DC regulated power supply output;
    • (4) Adjustable DC voltage: 0~10V adjustable output;
    • (5) Adjustable DC current: 0~20mA;
5. Laboratory Safety Management Platform Software (Genuine software, copyright certificate verification and demonstration are required on the bidding site)
  • 1) The power management terminal consists of a 2.8-inch TFT color LCD screen and a data acquisition module, which displays electrical parameters such as three-phase current, three-phase voltage, three-phase active power, three-phase reactive power, power factor and frequency of the experimental bench in real time.
  • 2) A correct password is required to start the power supply when the power management terminal is booted to avoid misoperation by students;
  • 3) After logging in with the correct password, you can set timed on/off, overvoltage alarm on/off, overvoltage alarm value, undervoltage alarm on/off, undervoltage alarm value, overcurrent alarm on/off, overcurrent alarm value, low balance alarm on/off.
  • 4) After logging in, you can view alarm records, recharge electricity, clear remaining electricity, etc.; you can also change the login password, set the system time synchronization mode, and configure the network via hotspot;
  • 5) The power switch status of the power management terminal can be inquired through the mobile APP, and the power supply of students' experimental benches can be turned on and off individually; the function of turning on or off the power supply of all experimental benches; the function of timing reservation for turning on and off the power supply of experimental benches.
  • 6) The APP software displays device temperature, power consumption histogram, three-phase total active power, total reactive power, phase A active power, phase A reactive power, phase A power factor, phase B active power, phase B reactive power, phase B power factor, phase C active power, phase C reactive power, phase C power factor and grid frequency in real time.
  • 7) The APP software can set overvoltage alarm on/off, overvoltage alarm value, undervoltage alarm on/off, undervoltage alarm value, overcurrent alarm on/off, overcurrent alarm value, low balance alarm on/off.
  • 8) The APP software can recharge the electricity meter equipment.
  • 9) The device can be shared with other members through the APP.
  • 10) The operations of the APP software are synchronized to the power management terminal in real time.
Send your message to this supplier
Send Now

Programmable Logic Controller Electronics Training Kits With Three Phase Four Wire Input And Safety Protection

Ask Latest Price
Brand Name :
RM
Model Number :
F128
Certification :
ISO9001/ISO45001/ISO14001,TUV
Place of Origin :
HENAN,CHINA
MOQ :
1 UNIT
Payment Terms :
T/T
Contact Supplier
Programmable Logic Controller Electronics Training Kits With Three Phase Four Wire Input And Safety Protection

Henan Ruimu Intelligent Technology Co., Ltd.

Verified Supplier
1 Years
henan, zhengzhou
Since 2018
Business Type :
Manufacturer, Exporter, Seller
Total Annual :
>$20 Million
Employee Number :
50~100
Certification Level :
Verified Supplier
Contact Supplier
Submit Requirement