| Model | Specification(mm) | Coil weight (ton) | Coil width(mm) | Thickness(mm) | Capacity(KW) | Area(m²) |
|---|---|---|---|---|---|---|
| DRC-400 | φ219-φ426 | 10 | 400-750 | 5-8 | 150 | 18*72 |
| DRC-500 | φ219-φ529 φ219-φ720 | 15 | 400-800 | 5-10 | 180 | 18*72 |
| DRC-600 | φ219-φ630 | 15 | 450-1050 | 6-10 | 190 | 21*72 |
| DRC-700 | φ219-φ720 | 15 | 500-1250 | 5-12.7 | 210 | 21*72 |
| DRC-800 | φ219-φ820 | 20 | 500-1300 | 6-12.7 | 220 | 24*78 |
| DRC-1000 | φ219-φ1020 | 20 | 500-1560 | 6-12.7 | 220 | 24*78 |
| DRC-1400 | Φ325-φ1420 | 25 | 500-1560 | 6-18 | 400 | 24*120 |
| DRC-1600 | Φ426-φ1620 | 30 | 1100-1600 | 6-20 | 400 | 24*120 |
| DRC-1800 | φ508-φ1820 | 30 | 1200-1600 | 8-25.4 | 500 | 24*180 |
| DRC-2000 | φ508-φ2020 | 30 | 1200-2000 | 8-25.4 | 550 | 24*180 |
| DRC-2400 | φ508-φ2400 | 30 | 1200-2000 | 8-25.4 | 600 | 24*200 |
| DRC-3000 | φ508-φ3000 | 30 | 1200-2000 | 8-25.4 | 700 | 24*200 |
All raw materials used in production, including steel coils, welding wires, and fluxes, must undergo strict physical and chemical inspections to ensure a solid foundation for product quality from the source.
Before forming, the strip steel needs to undergo leveling, trimming, planing, surface cleaning, transportation, and pre bending treatment to ensure the quality of the plate and prepare for subsequent high-precision forming.
Using an electric contact pressure gauge to control the conveyor pressure, ensuring smooth transportation of strip steel.
Adopting advanced external or internal control roll forming technology.
By using a weld seam gap control device, the pipe diameter, misalignment, and weld seam gap are strictly ensured to meet the welding standards.
Both internal and external welding are carried out using American Lincoln electric welding machines for single or double wire submerged arc welding, and active submerged arc welding is applied during strip steel docking and pipe body repair welding to achieve extremely stable and reliable welding quality.
Using an air plasma cutting machine to accurately cut steel pipes into single pieces, with smooth and efficient cuts.
Each batch of steel pipes must undergo a strict final inspection system, including weld mechanical properties, chemical composition, fusion condition, steel pipe surface quality, and non-destructive testing, to ensure that the pipe manufacturing process is 100% qualified before leaving the factory.
