High Temperature Iron Ladle Free Turning Motorized Trackless Die Transfer Vehicle
Introduction
Perfect Material Handling offers a wide range of Die Transport Vehicle specifically designed for the unique needs of both stamping and molding. These products include Die Transport Equipment, Die Cart, and Die Transfer Trolleys and Die Trailers Systems.
This Die Transport Vehicle could run on railways or cement floor which is chosen according to the transportation route or clients' project plan. The selecting concept: the rail transport cart is mainly used for fixed route no need of rotation; while the trackless transfer trolley on cement floor can realize 360° direction turning.
Conveyer Railway Conveyer
ailway Conveyer Railway Conveyer Railwy Conveyer

| Model | BXC-2t | BXC-20t | BXC-50t | BXC-100t | BXC-150t |
| Rated Load(t) | 2 | 20 | 50 | 100 | 150 |
| Table Size(mm) | Length(L) | 2000 | 4000 | 5500 | 6500 | 10000 |
| Width(W) | 1500 | 2200 | 2500 | 2800 | 3000 |
| Heigth(H) | 450 | 550 | 650 | 900 | 1200 |
| Wheel Base(mm) | 1200 | 2800 | 4200 | 4900 | 7000 |
| Rail Inner Gauge(mm) | 1200 | 1435 | 1435 | 2000 | 2000 |
| Wheel Diameter(mm) | 270 | 350 | 500 | 600 | 600 |
| Wheel Quantity | 4 | 4 | 4 | 4 | 8 |
| Ground Clearance(mm) | 50 | 50 | 50 | 75 | 75 |
| Running Speed(min) | 0-25 | 0-20 | 0-20 | 0-20 | 0-18 |
| Motor Power(kw) | 1 | 2.2 | 5 | 10 | 15 |
| Battery Capacity | 180 | 180 | 330 | 440 | 600 |
| Battery Voltage | 24 | 48 | 48 | 72 | 72 |
| Running Time When Full Load | 4.32 | 4 | 3.3 | 3.2 | 2.9 |
| Running Distance for One Charge(Km) | 6.5 | 4.8 | 4 | 3.8 | 3.2 |
| Max Wheel Load(KN) | 14.4 | 77.7 | 174 | 343.8 | 265.2 |
| Reference Weight(t) | 2.8 | 5.9 | 8 | 14.6 | 26.8 |
| Recommended Rail Model | P15 | P24 | P43 | QU100 | QU100 |
Application
The Die Transport Vehicle of PERFECT allow movement charges at ground level in all types of industries and applications, such as warehouse, within or without factory, bay to bay, airport, sea port, manufacturing workshop, production line, and son on.
Processing
CNC Cutting
Transport the steel plate from raw material warehouse to CNC cutting workshop for cutting. After the cutting, the workers will do some simple processing such as chip moving and setting out.
Preliminary Assembling
Put the cut steel plate together according to the design drawing
Welding
Weld the steel plate with automatic welding machine after the preliminary assembling
Post weld treatment
Test the welding section after the welding, polish and burring. Post weld treatment to eliminate welding stress
Spray Primer
Transport the structure part after processing to painting booth for spraying primer. The main component of the primer is zinc rich epoxy antirust paint. The primer is to two layers
Assembling
Assemble the structure parts after spraying primer with wheels, motors and gear box, etc.
Paint finish
Transport the assembled cart to painting booth, inspect the integrity of primer. After that paint the finish
Debugging
Debugging the cart after painting the finish with electric control system, after the debugging, the cart will test without load. And after the no load test, the cart will be tested with load. After the inspection, the cart will be transported to storage area.