Automated Fin Stamping Press Machine For Heat Exchanger Coil
Product Specifications
Model Numbers | 45T, 63T, 80T, 100T, 125T |
Specifications | Φ5,Φ6.35,Φ7,Φ7.94,Φ9.53,Φ12.7,Φ14.5,Φ15.88 |
Drive Mode | Electric |
Control System | Servo control |
Operation Interface | Touch Screen |
Quality Assurance | 100% Inspection |
Materials Processed | Aluminum foil, copper foil, stainless steel foil |
Product Description
The fin stamping press machine is an automated production line designed for high-speed stamping of aluminum, copper, and stainless steel foils into various fin shapes. These precision-formed fins are essential components in air conditioning systems and heat exchangers.
Available in capacities from 45 to 125 tons, the system features higher efficiency with increased tonnage through additional fin dies. The complete line includes:
- Aluminum foil unwinding and lubrication system
- Precision press mechanism
- Advanced pulling and jump devices
- Fin collection unit
- Integrated waste management
- Comprehensive electrical and pneumatic systems
Applications
This equipment is essential for manufacturing components in:
- Air conditioning and refrigeration systems
- Heat exchangers
- Surface coolers
- Evaporators and condensers
Manufacturer Information
Guangzhou Runshi Mold Co., Ltd. specializes in precision machinery manufacturing for the HVAC and industrial sectors. Our expertise includes:
- Machine equipment and fin dies for air conditioning production
- Vulnerable parts and cutting tools
- Components for new energy, medical, semiconductor, and aerospace industries
Frequently Asked Questions
Q: Are you a manufacturer or trading company?
A: We are the manufacturer with direct production capabilities.
Q: What industries use this equipment?
A: Primarily air conditioning, refrigeration, heat exchangers, evaporators, and condensers manufacturing.
Q: What is your production process?
A: Our engineers with 10+ years experience work from samples or drawings, maintaining strict tolerance controls.
Q: What are your delivery times?
A: 20-30 days for stock items, 40-60 days for custom production based on quantity.
Q: What are your payment terms?
A: For orders ≤$10,000: 100% advance. For orders >$10,000: 50% deposit, balance before shipment.