Specifications
Price :
Call for discussion
Packaging Details :
Original packaging
Product Length :
800mm
Category :
Unnamed
Weight :
Not specified
Corrosion Resistant Pump :
acid pump
Model Number :
50–4000 kW
Supply Ability :
9999
Brand Name :
MTU
Wastewater Pump :
drainage pump
Span Length :
100m,150m
Delivery Time :
15days
Gear Pump :
oil pump
Printing Area :
200*300mm
Size :
Not specified
MOQ :
1
Air Operated Pump :
diaphragm pump
Power :
110/220V 50/60Hz 20W
Material :
Not specified
Application :
Printing logo or stamps
Payment Terms :
T/T
Dimensions :
Not specified
Place of Origin :
Germany
Booster Pump :
industrial pump
Description

I. MTU Generator Sets/Engines Full Range of Models (504000 kW)

1) Low-power (50200 kW; predecessor to the 1600 series/miniature model)

4R0113/4R0120:DS50/60/80/100/125(50125kW)

6R0113/6R0120:DS150/180/200(150200kW)

2) Medium power (200700 kW, 1600 series)

1600 Series (in-line 6/8-cylinder):

6R1600G20F:250kW

8R1600G40F:400kW

16V1600G80F:650700kW

3) Medium to large main units (7001300 kW, 2000 series)

2000 Series (V8/V10/V12/V16):

8V2000G25:750kW

12V2000G23/G65:9001100kW

16V2000G65:12001300kW

4) High-power (15004000 kW, 4000 series, flagship model)

4000 series (V12/V16/V20):

12V4000G23/G63:15001800kW

16V4000G23/G63:20002500kW

[Image download failed]

II. MTU Standard Maintenance Cycle (W1W6, Universal)

W1 Start daily/each time (required)

Oil level, coolant level, diesel level

Leakage (oil/water), belt, air filter, battery terminals

Alarm code, smoke color, water temperature/oil pressure

W2: 50 hours (first maintenance for new unit)

Oil + Engine Filter (0031845301)

Clean the air filter and drain the fuel oil and water

Tighten the external bolts and check the belt tension

W3: 250 hours (minor maintenance)

Oil + Engine Filter (2 units, 0031845301)

Fuel fine filter (0020922801)

Air filter inspection, belt/tensioner, cooling system

W4: 1000 hours (medium maintenance)

Including all W3 items

Air filter (2 units, 0180941002)

fuel coarse filter/water separator (X52407500020)

Valve clearance, injector inspection, turbine inspection

W5: 2000 hours/12 months (major maintenance)

Including all W4 items

Coolant replacement, belt + tensioner

Injector calibration, high-pressure oil pump inspection

Generator bearing lubrication, ECU calibration

W6: 40008000 hours (major overhaul)

Cylinder liner, piston, piston rings, large and small bearings, valves, oil seals

Major overhaul of the turbocharger; inspection and maintenance of the fuel system assembly

III. Key Maintenance Points for Common MTU Malfunctions

to start: Low battery voltage, fuel misting into air, diesel filter clogging, poor injector atomization, ECU malfunction

Black smoke/low power: Air filter clogged, injector failure, turbo failure, EGR stuck, insufficient cylinder pressure

High water temperature: Water tank blockage, thermostat (0022035475) cannot be opened, belt slippage, insufficient coolant

Low engine oil pressure: low oil level, clogged engine filter, worn oil pump, worn bearing bushings, sensor failure

Electrical control alarm: Sensor failure (water temperature/oil pressure/rotational speed), wiring harness aging, ECU program anomaly

Send your message to this supplier
Send Now

MTU Generator Unit: Maintenance Cycle and Original Factory Parts List

Ask Latest Price
Price :
Call for discussion
Packaging Details :
Original packaging
Product Length :
800mm
Category :
Unnamed
Weight :
Not specified
Corrosion Resistant Pump :
acid pump
Contact Supplier
MTU Generator Unit: Maintenance Cycle and Original Factory Parts List
MTU Generator Unit: Maintenance Cycle and Original Factory Parts List
MTU Generator Unit: Maintenance Cycle and Original Factory Parts List

Hunan Chengzhai Machinery Equipment Co., Ltd.

Verified Supplier
1 Years
hunan, changsha
Since 2023
Business Type :
Trading Company, Seller, Exporter, Importer, Distributor/Wholesaler, Manufacturer, Agent
Total Annual :
CNY 20M-CNY 50M
Employee Number :
10~49
Certification Level :
Verified Supplier
Contact Supplier
Submit Requirement