How long does it take to deliver a steel structure building?
Generally, the production cycle is 30-45 days after the design is finalized. Shipping time depends on the destination port, typically ranging from 15 to 40 days.
Can your steel buildings be customized to specific local building codes?
Yes, our engineering team can design the structure to meet specific local wind speeds, snow loads, and seismic requirements according to international standards.
What maintenance is required for a steel structure?
Steel buildings require very low maintenance. Periodic inspections of the paint or galvanized coating and clearing of roof gutters are usually sufficient to ensure a lifespan of over 50 years.