Specifications
Packaging Details :
Multi-crate export packaging with installation tool kit and on-site commissioning support
Production Speed :
40-60 bottles/min
Line Length :
Customizable
Delivery Time :
50-70 working days
Price :
USD 35000-60000 / Set
Body Material :
304 Stainless Steel
Model Number :
HFM-CL
Brand Name :
Gieni
Payment Terms :
T/T, L/C
Line Configuration :
Bottle Feeding + Hot Filling + Capping + Labeling
Heating Method :
Electric Jacket Heating
Contact Material :
316L Stainless Steel
Voltage :
380V 3-Phase
Filling Nozzles :
8-12 (Configurable)
Place of Origin :
Shanghai, China
Power :
20 KW Total
MOQ :
1 Set
Tank Capacity :
60L (Expandable)
Control System :
Central PLC with Multi-Station HMI
Certification :
CE, ISO 9001, GMP
Supply Ability :
8 Sets per Month
Description

HFM-CL Complete Automatic Hot Filling Production Line

The HFM-CL is a fully integrated turnkey hot filling production line that combines automatic bottle feeding, precision hot filling, capping, and labeling into one seamless system. Controlled by a central PLC with multi-station HMI panels, it delivers a complete production solution from empty bottle to labeled finished product.

Key Features

  • Complete Turnkey Solution: Single-source responsibility for the entire line — bottle unscrambler, conveyor, hot filler, capper, and labeler — all pre-tested as one system before shipment.
  • Central PLC Control: Unified control architecture with synchronized line speed, automatic accumulation control, and single-point recipe management across all modules.
  • Flexible Configuration: Choose 8 or 12 filling nozzles and 60L standard or expanded tank capacity based on production requirements.
  • Quick Installation: Modular design with pre-wired connections and alignment pins enables installation and commissioning within 3-5 days.
  • On-Site Support: Includes remote and optional on-site commissioning by Gieni engineers for guaranteed production ramp-up.

Technical Specifications

ParameterSpecification
ModelHFM-CL
Output40-60 bottles/min
Total Power20 KW
Line LengthCustomizable
Send your message to this supplier
Send Now

HFM-CL Complete Automatic Hot Filling Production Line Bottle Feeding Filling Capping Labeling Integrated

Ask Latest Price
Packaging Details :
Multi-crate export packaging with installation tool kit and on-site commissioning support
Production Speed :
40-60 bottles/min
Line Length :
Customizable
Delivery Time :
50-70 working days
Price :
USD 35000-60000 / Set
Body Material :
304 Stainless Steel
Contact Supplier
HFM-CL Complete Automatic Hot Filling Production Line Bottle Feeding Filling Capping Labeling Integrated

Shanghai Gieni Industry Co.,Ltd

Verified Supplier
9 Years
shanghai, shanghai
Since 2011
Business Type :
Manufacturer, Distributor/Wholesaler, Exporter, Seller
Total Annual :
500,000-1000,000
Employee Number :
20~50
Certification Level :
Verified Supplier
Contact Supplier
Submit Requirement