Specifications
Brand Name :
ZHAOLI
Model Number :
DXJ
Certification :
CE
Place of Origin :
CHINA
MOQ :
1 set
Price :
Negotiable
Payment Terms :
L/C, D/A, D/P, T/T, Western Union
Supply Ability :
30 sets per month
Delivery Time :
30 days after receive deposit
Packaging Details :
semi-automatic slotting corrugated carton box stitching machine : plastic film
product name :
semi-automatic slotting corrugated carton box stitching machine
function :
carton box stitching
automatic type :
semi-automatic
speed :
400nails/min
model :
DXJ-2000
feature :
change order one minutes
other name :
semi-automatic speeding corrugated carton box stitching machine
Description

Semi-automatic Slotting Corrugated Carton Box Stitching Machine

Machine features:

1 One minute quick order change.The whole machine adopt full electrical control,easy to operate, no training.
2 Single, double, supplement stitching are available.
3 Stitching pitch is 20-160mm, automatic caculate stitching pitch; servo motor from Taiwan to control stitching pitch.
4 Touch screen adopt Taiwan Eview brand, 5.7 inch high definition colorful display touch screen.
5 The latter department automatic counter, can design as 1-99, easy to binding.
6 Head and fork material main is exported alloy steel, made through special heat treatment process.
7 The max unfolded single sheet width is 4m, min is 1m.
8 Stitching whatever the carton have cover or not, the first stitch pitch is 20mm.
9 Adopt Germany timing belt to send the paperboard, can avoid the price scissors. Adjust feeding paperboard timing belt electrically, adjust head size electriclly to fasten change order speed.
10 Working table up and down automaticlly.

Technology:

max working size (length+width)x2 2460mm
min working size (length+width)x2 606mm
max working size (width+height)x2 1515mm
min working size (width+height)x2 300mm
height of table 900mm
speed 400nails/min
power 4kw
machine size 2.8x2.6x1.7m
machine weight 2000kg
stitching pitch 30-100mm

Package:

The normal package is plastic film(Size: L*W*H). If export to european countries,the wooden box will be fumigated.If container is too tigher,we will use pe film for packing or pack it according to customers special request.

pictures:

Change Order One Minutes Automatic Stitching Machine For Corrugated Boxes

Send your message to this supplier
Send Now

Change Order One Minutes Automatic Stitching Machine For Corrugated Boxes

Ask Latest Price
Brand Name :
ZHAOLI
Model Number :
DXJ
Certification :
CE
Place of Origin :
CHINA
MOQ :
1 set
Price :
Negotiable
Contact Supplier
Change Order One Minutes Automatic Stitching Machine For Corrugated Boxes
Change Order One Minutes Automatic Stitching Machine For Corrugated Boxes

Cangzhou Zhaoli Import & Export Trade CO.,LTD.

Active Member
9 Years
hebei, cangzhou
Since 2013
Business Type :
Manufacturer, Exporter, Trading Company, Seller
Total Annual :
3,000,000-5,000,000
Certification Level :
Active Member
Contact Supplier
Submit Requirement