Formwork Tie Nut Take 140 Up To 150 Blows Before Break:
The nut and plate is being turned on a tie bar, to clamp formwork plates. The formwork plates make a mould to poor a concrete element.
After the concrete has hardened, the formwork plates have to be removed by losening the nut. While the nut is very firm, they use hammer blows to loosen. After 2 or 3 blows the nut is loose and can be turned of.
To test quality, customer counts the amounts of hammer blows before the nut breaks. Our cast iron wing nut with heat treatment can take 140, up to 150 blows before break.
Specification of Formwork Tie Nut Take 140 Up To 150 Blows Before Break:
Tie nut types | Formwork wing nut | Formwork Ancher tie nut | Swivel formwork tie nut |
Weight | 0.175/0.25/0.3/0.61kg | 0.16/0.36/0.5/0.6/0.65/1kg | 1.25/1.3kg |
Pull strength | 140-150KN | 170-180KN | 170-180KN |
Photo | ![]() | ![]() | ![]() |
Process | Casted | ||
Surface treatment | Natural, Electric Galvanized ,Hot Dip Galvanized | ||
Heat treatment | For enhance nut's hardness, tensile strength, etc | ||
Match tie rod | 12/17/20MM or customized size | ||
Material | Ductile casted iron QT450-10 | ||
Color | Self-color (black), silver galvanized or golden galvanized |
Advantages of Formwork Tie Nut Take 140 Up To 150 Blows Before Break:
OEM service
* products, logos, package, all could be customized as request.
* Manufacturer with trade ability* Professional foreign trade business and service team* OEM available
What else we supply:
We also supply formwork accessoris, tie nut, tie rod, plastic sleeve, cone, formwork plate, water stopper, scaffold props, scaffold frame, scaffold coupler, jack base, plastic rebar caps, plastic roman pillar, plastic safety fence, OEM service. Please feel free to contact us for one stop shopping of construction products from China, best price and service will be offered!!!