Product Overview ——Clean Work Room Air Shower with GMP Standard and Electronic Interlock Air Filtration

The air shower is akin to the cleanroom's "air bath." Before entering high-cleanliness areas, personnel and goods must undergo a "clean storm" lasting approximately 15–30 seconds within it, designed to blow away the vast majority of dust carried on their surfaces. It serves as the "gatekeeper" protecting the internal environment of the cleanroom.
Main Specification for Air Shower
| ITEM NO. |
PERSONNEL AIR SHOWER |
CARGO AIR SHOWER |
| SHP01 |
SHP02 |
SHP03 |
SHP04 |
| EXTERNAL SIZE(W×D×H) mm |
1300×1000×2050 |
1500×1000×2050 |
1500×2000×2050 |
2200×2000×2050 |
| INTERNAL SIZE(W×D×H) mm |
800×920×1895 |
800×920×1895 |
800×1920×1895 |
1500×1920×1980 |
| PERSONS PER CYCLE |
one person |
one person |
two person |
N/A |
| BLOWING WAY |
one side blowing |
two sides blowing |
two sides blowing |
two sides blowing |
| BLOWER POWER |
550w × 1set |
550w × 2set |
550w × 4set |
750w × 2set |
| NO. OF NOZZLES |
6 pcs |
12 pcs |
24 pcs |
24 pcs |
| LED LIGHTS |
20w × 1pcs |
20w × 1pcs |
20w × 2pcs |
20w × 1pcs |
| PRIMARY AIR FILTER |
G3,G4 |
| HEPA FILTER EFFICIENCY |
H14(99.99%@0.3μm) |
H14(99.99%@0.3μm) |
H14(99.99%@0.3μm) |
H14(99.99%@0.3μm) |
| SIZE OF HEPA FILTER |
700×610×100 1pcs |
700×610×100 2pcs |
700×610×100 4pcs |
700×610×100 4pcs |
| SPRAYING WIND SPEED |
20-25m/s |
| SHOWER TIME |
0-99s adjustable |
Features at a Glance
- Core Purification Function:Forced Surface De-dusting
- Uses high‑velocity clean airflow (20‑28 m/s) to conduct all‑around blowing on personnel/material surfaces, physically dislodging and removing adhering particles (typically ≥0.5 µm). It is the mandatory final step of surface purification before entering the clean area.
- Airlock Barrier Function:Prevention of Cross‑Contamination
- Employs a "dual‑door interlock" design to ensure the inner and outer doors cannot be opened simultaneously, creating a physical airlock that effectively prevents direct airflow exchange between untreated external air and cleanroom air, maintaining the integrity of the clean zone’s airflow and pressure.
- Pressure Differential Maintenance:Stabilizing the Clean Environment
- Acts as a dynamic airlock chamber that helps establish and maintain a positive pressure differential between the clean area and the external corridor or non‑clean area at the entry point, preventing contaminated air from back‑flowing due to pressure differences.
- Contamination Control Function:Reduction of Human‑Borne Contamination
- Serves as a key component of the cleanroom "contamination control strategy," significantly lowering the risk of particles, fibers, and other contaminants generated and carried by human activity (movement, friction) from entering the core controlled environment.
- Air Recirculation Function:Energy Saving & Continuous Purification
- Utilizes a recirculating filtration system: "Dirty air" after showering is collected through bottom return vents, filtered again through pre‑filters and HEPA filters, and then recirculated as clean air for showering, enabling efficient air reuse and operational energy savings.
- Management & Alert Function:Process Standardization & Behavioral Guidance
- - Mandatory Procedure: Interlock logic enforces completion of the full shower cycle.
- Audio‑Visual Indicators: Signal lights and buzzers indicate shower status (ready, in progress, completed), standardizing user behavior.
- Adjustable Timing: Shower duration (typically 15‑30 seconds) can be set according to cleanliness class requirements.
Products Description

- Slide rail style door closer:A slide rail door closer for air showers is a high-durability, high-precision core functional component designed to safeguard cleanroom environments.
- LCD control screen:The LCD control panel is not only the "intelligent brain" of the air shower but also a critical component that enhances equipment reliability, operational efficiency, and management standards.
- Stainless steel nozzle:For cleanrooms with high standards, high-frequency usage, and stringent certification requirements (such as those in , biotechnology, microelectronics, precision instruments, etc.), stainless steel nozzles are an essential and wise choice. They offer exceptionally long service life, nearly zero maintenance costs, and irreplaceable reliability.
- High efficiency filter:The HEPA filter is the "lungs" of the air shower, directly determining the quality of the blown air. Its ultra-high filtration efficiency, stable performance, and compliance are non-negotiable advantages.
Related Products

Company Profile

As a leading supplier of clean room system and clean room products,SHP is an organization that prides itself both on technical expertise as well as next level customer care.SHP offers Cleanroom Solutions to meet our clients' particular requirements specialized for pharmaceutical,biotechnology and microelectronic cleanrooms.We also provide a range of Clean Room products including wall panel,door&window and a series of clean room equipment.
As an ISO 9001:2015 certified organization,we are committed to continually improving our customer service programs while meeting or exceeding your product quality criteria.With our comprehensive customer solution offerings,excellence in products,and decades of technical expertise,we are confident that SHP can match the best to your application.
Our Certification

Our Customers

Customer Photos

FAQ
Q1: Where is your company?
A1:Our company is located in Suzhou City, close to Shanghai. It's a 1.5-hour drive from PVG Airport.
Q2: Are you a manufacturer or a trading company? What can I buy from you?
A2: We are manufacturers. We focus on cleanroom projects, air showers, FFUs, through boxes, dosing rooms, laminar flow hoods and benches, AHUs, and sealed doors and Windows.
Q3:When is your delivery time?
A3: If your cleanroom project includes AHU, the delivery time is 35 days. If you purchase goods without an AHU, the delivery time is 10 days.
Q4: How long is your warranty period? What kind of after-sales service can you offer?
A4: Our warranty period is two years after the completion of the project. During the warranty period, if there are any problems, we will replace it. If you can't handle it, we will send an engineer to solve it for free.
Q5:Can you conduct cleanroom validation?
A5: Yes, we can offer documentaries of DQ, IQ, OQ and PQ. Still fat & Sitting. Product operation manual, maintenance guide and a complete set of cleanroom drawings.
Q6:What are your advantages?
A6: We have a complete technical team consisting of 12 senior cleanroom and HVAC engineers to provide you with technical support. We have completed over 2,100 cleanroom projects in China and overseas. Such as Japan, Indonesia, Thailand, Bangladesh, India, North Macedonia, Saudi Arabia, Yemen, Russia, Moldova, Switzerland, Norway, the United Kingdom, Spain, France, Belgium, Kuwait, Tunisia, Mauritius, Sri Lanka, Mongolia, Philippines, Nepal, Sudan, Somaliland, Australia, New Zealand, Canada, Algeria, Egypt, Singapore, and the United States.