Specifications
Brand Name :
Suntech
Model Number :
SH2-OPGW1
Certification :
ISO9001
Place of Origin :
China
MOQ :
1 PCS
Price :
Negotiation
Payment Terms :
L/C,T/T
Supply Ability :
5000 PCS/Month
Delivery Time :
3-5days
Packaging Details :
Plywood Case
Name :
Double Sheave Block For Changing Line
Item No. :
20123
Model :
SH2-OPGW1
Rated Load :
2KN
Weight :
2.2-2.4KG
Warranty :
1 year
Description

Professional Double Sheave Block For Changing Line In Power Transmission Projects


Product Introduction​

  • Essential equipment for changing conductor direction during line installation

  • Dual sheave design provides optimal cable guidance and protection

  • Trusted solution by transmission line contractors nationwide

​Key Features​

  1. 1.

    ​Superior Cable Guidance​

    Precision-aligned sheaves ensure smooth directional changes

    Special groove profile minimizes conductor wear

  2. 2.

    ​Robust Construction​

    Forged alloy steel frame withstands heavy pulling forces

    Reinforced mounting points for secure anchoring

  3. 3.

    ​Safety Assurance​

    Load-rated components prevent overstress conditions

    Positive locking mechanism secures conductor

  4. 4.

    ​Operational Efficiency​

    High-capacity bearings reduce rotational resistance

    Quick-release pins enable rapid configuration changes

  5. 5.

    ​Durability Features​

    Weather-resistant coating protects against elements

    Self-lubricating bushings extend service life

​Typical Applications​

  • Transmission line angle tower installations

  • Conductor stringing around obstacles

  • Dead-end and tension section transitions

  • Temporary line redirection during maintenance

​Workflow Integration​

  • Compatible with all standard stringing equipment

  • Works with both manual and tension stringing methods

  • Integrates with tension monitoring systems

​Maintenance Advantages​

  • Minimal maintenance requirements

  • Easy to inspect and service

  • Modular design simplifies component replacement

​User Guidelines​

  1. 1.

    ​Pre-Operation​

    Inspect sheave grooves for debris

    Verify proper alignment with conductor path

  2. 2.

    ​During Use​

    Maintain steady pulling speed (under 15ft/min)

    Monitor conductor position continuously

  3. 3.

    ​Post-Use​

    Clean after exposure to contaminants

    Store in dry conditions

​Industry Compliance​

  • Meets IEEE stringing equipment standards

  • OSHA compliant for construction sites

  • Certified by major utilities

​Why Professionals Choose Us​

  • 40% smoother directional changes than single sheave blocks

  • 30% longer service life than conventional designs

  • 1-year performance warranty

​Customer Support​

  • Free installation consultation

  • 24/7 technical support

  • On-site training available

​Purchasing Options​

  • Standard and custom configurations

  • Bulk discounts for large projects

  • Expedited shipping options


Item Number Model

Outing Size

(MM)

Rated Load

(KN)

Weight

(KG)

20123 SH2-OPGW1 152x110x343 2 2.4
20124 SH2-OPGW2 128X65X365 2 2.2


Double Sheave Block for Power Transmission Line Changing SH2-OPGW1

Send your message to this supplier
Send Now

Double Sheave Block for Power Transmission Line Changing SH2-OPGW1

Ask Latest Price
Brand Name :
Suntech
Model Number :
SH2-OPGW1
Certification :
ISO9001
Place of Origin :
China
MOQ :
1 PCS
Price :
Negotiation
Contact Supplier
Double Sheave Block for Power Transmission Line Changing SH2-OPGW1
Double Sheave Block for Power Transmission Line Changing SH2-OPGW1
Double Sheave Block for Power Transmission Line Changing SH2-OPGW1
Double Sheave Block for Power Transmission Line Changing SH2-OPGW1

Ningbo Suntech Power Machinery Tools Co.,Ltd.

Verified Supplier
6 Years
zhejiang, ningbo
Since 1995
Business Type :
Manufacturer, Distributor/Wholesaler, Agent, Importer, Exporter, Trading Company, Seller, Other
Total Annual :
>300 Million
Employee Number :
>158
Certification Level :
Verified Supplier
Contact Supplier
Submit Requirement