Service | CNC Turning/CNC Milling/Laser Cutting/ Bending/ Spinning/ WireCutting/Stamping/ Electric Discharge Machining(EDM)/ Injection Molding |
Available Materials | Aluminum, stainless steel, copper, iron, plastic,titanium alloy etc. |
Size or shape | According to customer drawings or requests |
Drawing Accepted | PDF、DWG、IGS、STP、XT、DXF、Pro/E、STL、STEP |
Surface treatment | Anodized. Bead Blasted. Silk Screen.PVD Plating,Zinc/Nickel/Chrome/Titanium Plating,Brushing,Painting,Powder Coated,Passivation,Electrophoresis,Electro Polishing,Knurl, Laser/Etch/Engrave etc. |
Tolerance | ±0.001~±0.01mm |
Surface Roughness | Min Ra 0.1~3.2 |
Delivery Time | 3-30 days after order with prepayment based on products structure and quantity |
Physical surface treatment | sandblasting, wire drawing, shot blasting, polishing, rolling, brushing, spraying, painting, powder spraying, silk screen printing, pad printing, water transfer printing, electrophoresis, etc. |
Chemical surface treatment | bluish blackening, phosphating, pickling, electroless plating, TD treatment, QPQ treatment,carburizing, nitriding, chemical oxidation, passivation, etc. |
Electrochemical surface treatment | anodic oxidation, hard anodic oxidation, electrolytic polishing, electroplating, etc. |
Modern surface treatment | chemical vapor deposition (CVD), physical vapor deposition (PVD), ion implantation, ion plating,laser surface treatment, etc. |
FAQ |
Q1:Are you a manufacturer or a trading company? |
A1:We are a 1500-square-meter factory located in Huizhou, China. |
Q2:Can I get a quote without drawings? |
A2:Sure, we appreciate to receive your samples, pictures or drafts with detailed dimensions for accurate quotation. |
Q3:Will my drawings be divulged if you benefit? |
A3:No, we pay much attention to protect our customers’ privacy of drawings, signing NDA is also accepted if need. |
Q4:Can you provide samples before mass production? |
A4:Sure, sample fee is needed, will be returned when mass production if possible. |
Q5:How about the lead time? |
A5:Generally, 1-2 weeks for samples, 3-4 weeks for mass production. |
Q6:How do you control the quality? |
A6:(1) Material inspection--Check the material surface and roughly dimension. (2) Production inspection--Each production section will check the key dimensions and appearance.Before surface treatment, do a good job of product packaging to avoid bumps and injuries. And check visual inspection (3) Sampling inspection--Check the quality before sending to the warehouse. (4) Pre-shipment inspection--100% inspected by QC assistants before shipment. |
Q7:What will you do if we receive poor quality parts? |
A7:Please kindly send us the pictures, our engineers will find the solutions and remake them for you asap. |