Butt Welded Pipe Fitting 90 Degree Carbon Steel Elbow
Product Description:
Manhole Cover: Standard: EN1024 loading capability: A15 B125 C250 D400 Material: ductile iron GG 500-7 Coating: Black bitumen painting Main market: Agentina Romania Russa Yemen U A E Isrea Palestan 2) Malleable iron pipe fittings: Standard: BS ANSI non-standard Item: banded, beaded / beaded with ribs, plain Types: galvanized (hot dipped or baked, electric),black, Weight: heavy middle and light Main market: Peru Chile Saudi Arabia Syria U. A. E Jordan Yemen Africa
BUTT-WELDING PIPE FITTINGS DETAILS |
MATERIAL | Carbon Steel : |
ASTM, A234WPB, A234WPC, A420WPL6 ,Q235,10#, A3, Q235A, 20G,16Mn, |
DIN St37, St45.8, St52.4,St.35.8,St.35.8. |
Stainless Steel: |
1Cr18Ni9Ti 0Cr18Ni9 00Cr19Ni10 0Cr17Ni12Mo2Ti |
00Cr17Ni14Mo2 304 304L 316 316L |
Alloy Steel: |
16Mn Cr5Mo 12Cr1MoV 10CrMo910 15CrMo 12Cr2Mo1, |
A335P22 St45.8, ASTM A860 WPHY X42 X52 X60 X70 |
STANDARD | ASTM / JIS / DIN / BS / GB/GOST |
MODEL | 1.Tee(Straight and Reducing) 2.180 DEG Return |
3.Elbow (45/90/180 DEG) 4.Cap |
5. Reducer(Concentric and Eccentric) |
TYPE | Seam Or Seamless |
ELBOW DEGREE | 45 degree, 90 degree, 180 degree |
SURFACE | Black Paint, Anti Rust Oil, Hot-Dipped Galvanize |
WALL THICKNESS | SCH5S,SCH10S,SCH10,SCH20,SCH30,SCH40,STD,XS,SCH60, |
SCH80,SCH100,SCH120,SCH140,SCH160,XXS,2MM |
SIZE | 1/2"-48"(Dn15-Dn1200) |
CONNECTION | Welding |
SHAPE | Equal, Reducing |
CERTIFICATE | ISO9001 |
APPLICATION | Petroleum, chemical, power, gas, metallurgy, shipbuilding, construction, etc |
RELATED PRODUCTS | 1. Carbon steel nipples and sockets | 2. Flanges |
3. Malleable iron pipe fittings | 4. Pipes |
5. High-pressure fittings | 6. Valves |
7. P.T.F.E .thread seal tape | 8. Brass fittings |
9. Ductile iron pipe fittings | 10. Copper fittings |
11. Sanitary fittings, etc,. | 12. Grooved fittings |
Customers’ drawings or designs are available. |
PACKAGE | 1> 1/2" - 2" in cartons. |
2>Above 2" in wooden cases. |
Big size is workable by pallets. |
DELIVERY DETAILS | According to the quantities and specifications of each order. |
Normal delivery time is from 30 to 45 days after receiving the deposit. |
Used to the pipes connecting ,
Petroleum, chemical, power plant, gas, metallurgy, shipbuilding, construction, etc
why should you buy from us
1. auto-production line cast productio
2 Manual work add
3 drawing design
4. 10 Managers 5 Engineer and 50 workers
5. production capability: 50 tons per ton 6. factory MTC 7. service after-sale


