This product is a butt-welding pipe cap manufactured from UNS C70600 (90/10 Copper-Nickel alloy / CuNi 90/10) in accordance with ASTM B466 and ASME B16.9 standards. Also known as CuNi10Fe1.6Mn or Werkstoff Nr. 2.0872, this alloy consists of approximately 90% copper and 10% nickel, with small additions of iron and manganese to enhance strength and corrosion resistance. A pipe cap is a dome-shaped or ellipsoidal closure fitting welded directly to the pipe end with a full-penetration butt weld, providing a permanent seal. This 8" fitting is designed for permanent butt-weld connection to terminate the end of a piping system in demanding marine and industrial applications.
| Parameter | Details / Range |
|---|---|
| Material Standard | ASTM B466 / ASME SB466 |
| Dimensional Standard | ASME B16.9 / ANSI B16.9 |
| Material Grade | UNS C70600 (CuNi 90/10 / CuNi10Fe1.6Mn / DIN 2.0872) |
| Type | Butt-welding Pipe Cap (Ellipsoidal) |
| Nominal Size | 8" (DN200 / NPS 8) |
| Outside Diameter | 219.1 mm |
| Overall Length (E / H) | 102 mm (4.00 in) |
| Wall Thickness | To match pipe schedule (customer specified) |
| End Connection | Butt-weld beveled ends (37.5° per ASME B16.25) |
| Shape | Ellipsoidal (standard) / Hemispherical |
| Chemical Composition (Cu/Ni/Fe/Mn) | Cu: 88.6% min / Ni: 9.0-11.0% / Fe: 1.0-1.8% / Mn: ≤1.0% |
| Tensile Strength | 303-414 MPa (44,000-60,000 psi) |
| Yield Strength (0.2%) | ~110-135 MPa (16,000-20,000 psi) |
| Elongation | 30-42% |
| Density | 8.94 g/cm³ (0.323 lb/in³) |
| Melting Point | ~1240°C (2260°F) |
| Size Range (General) | 1/2" – 48" (DN15 – DN1200) |
| Dimensional Tolerance (OD) | + 2.4 / -1.6 mm for NPS 5-8 |
| Dimensional Tolerance (Length) | ± 6 mm for NPS 5-8 |
This butt-welding cap is ideal for seawater and corrosive fluid systems where permanent pipe termination is required:
Marine & Shipbuilding: Seawater cooling systems, firewater lines, ballast systems, ship hull fittings
Offshore Oil & Gas: Platform piping, subsea applications, seawater injection systems
Desalination Plants: Seawater intake headers, brine discharge lines
Power Generation: Condenser cooling water systems, heat exchangers
Chemical Processing: Chloride-containing environments where stainless steel may suffer SCC
Hydrostatic Testing: Temporary sealed ends for pressure testing (caps may be cut off later)
Superior Seawater Corrosion Resistance: Exceptional resistance to pitting, crevice corrosion, and stress corrosion cracking in marine environments. Long-term corrosion rates decrease continuously to below 2.5 µm/yr
Biofouling Resistance: Naturally forms a protective oxide layer that resists marine biological growth
Excellent Weldability: Single-phase alpha structure enables outstanding fabrication properties without complex preheating or post-weld heat treatment
Cost-Effective: Offers favorable balance of performance and cost compared to 70/30 CuNi, titanium, or super duplex grades
Permanent Seal: Full-penetration butt weld provides a leak-proof, permanent closure with high structural integrity
Low Maintenance: Long service life with minimal upkeep; ideal for systems where access is difficult
The butt-welding cap provides a permanent, leak-proof closure for the end of a pipe in a piping system. It is welded directly to the pipe end with a full-penetration butt weld, forming a dome-shaped or ellipsoidal seal that completely blocks fluid flow. Unlike removable closures such as blind flanges, a pipe cap is a permanent fitting that requires cutting to remove. It is commonly used to terminate pipelines permanently, seal pipe ends during hydrostatic testing, or close off unused branches in a piping network.
Unpacking Inspection: Check for transit damage; verify markings, dimensions, and material certification per ASME B16.9
Surface Preparation: Clean the weld bevel and adjacent area using dedicated stainless steel tools; remove all oil, grease, and contaminants
Alignment: Accurately align the cap with the pipe end, ensuring proper fit-up. The cap material must match the pipe material to avoid galvanic corrosion
Tack Welding: Apply minimum tack welds to hold the cap in position; clean thoroughly before final welding
Welding: Perform full-penetration butt weld following approved WPS with certified welders. Use GTAW (TIG) process with matching ERCuNi filler wire (AWS A5.7). Use 100% argon shielding; back purge recommended for root pass. Preheat generally not required; interpass temperature ≤150°C. No post-weld heat treatment required
Post-Weld: Clean weld area; perform NDT (PT/MT, UT) as per project requirements
Hydrotest (if applicable): Test pressure = 1.5 × design pressure; ambient temperature not below 5°C
Cleanliness: Requires a higher degree of cleanliness than carbon steel fabrication; use dedicated stainless steel tools
Temperature Limit: For aqueous corrosion service, verify system conditions for temperatures above 300°C
Welding Heat Input: CuNi puddle is sluggish with an oxide film; requires appropriate amperage control and technique
Medium Compatibility: Not recommended for use with strong oxidizing acids (e.g., nitric acid) or ammonia systems
Material Matching: Cap material must match the pipe material to prevent galvanic corrosion and code violations
Permanent Closure: Unlike blind flanges, pipe caps are permanent and require cutting to remove
Standard delivery time is typically 15–30 days, subject to order quantity, wall thickness, and specification availability
Common international payment methods include T/T (Telegraphic Transfer) and L/C at sight (Letter of Credit)
Products are securely packed in plywood cases or wooden crates with internal cushioning to ensure safe transportation and prevent damage during transit
All products undergo strict quality inspection before shipment, with Mill Test Certificates (EN 10204 3.1/3.2) available
Third-party inspection (ABS, DNV, CCS, LR, BV, etc.) available upon request
In case of quality issues, retain original packaging and provide relevant photos or third-party inspection reports
Specific return, exchange, and warranty terms are subject to the final sales contract agreement.
..

FAQ
1. Are you trading company or manufacturer ?
We are manufacturer ,You can see the certification.
2. How long is your delivery time?
Generally it is 5-10 days if the goods are in stock. or it is 15-20 days if the goods are not in stock, it is according to quantity.
3. Do you provide samples ? is it free or extra ?
Yes, we could offer the sample for free charge but need pay the cost of freight.
4. What is your terms of payment ?
Payment<=1000USD, 100% in advance. Payment>=1000USD, 50% T/T in advance ,balance before shippment.