Specifications
Brand Name :
Greenson
Place of Origin :
HEBEI
MOQ :
1
Price :
US $2000000-4000000
Payment Terms :
L/C,T/T
Delivery Time :
90 days
product name :
Made In China Rock Wool Panel Production Line Mineral Wool Making Machine Factory
Keyword :
Rock Wool Board Production Line Plant
Production Capacity :
10000-50000tons/year
Density :
100-200kg/m3
Main Process :
mixing, forming, water cutting, drying
Fire Resistance :
Class A1
Length :
1200-2400mm
After-Sales Service :
Engineers available to service machinery overseas
Description
Made In China Rock Wool Panel Production Line Mineral Wool Making Machine Factory

The raw materials used in rock wool production include basalt, dolomite, binders, etc. The raw materials are loaded into the hopper by the elevator, and the melting furnace is heated and melted into the melt flow tank. The lava flow is cooled and spun into fibers by the centrifuge, and then sprayed into the fiber molding room. The binder is added during the spraying process, and the fibers are heated by the negative pressure wind. Pull down to the mesh belt to form the original felt. The mesh belt transports the original felt to the pendulum cloth machine to swing the cloth. The original felt after the swing cloth is transported to the curing furnace by the cloth machine, and runs forward between the upper and lower chain belts. The hot air blower blows the hot air into the curing furnace. The cotton felt in the furnace is solidified, and the solidified products are cut, first longitudinally cutting, and then transversely cutting, and the finished product is packaged and put into storage.

Product Parameters
Specification Details
Application Manufacture Rock Wool Blanket, Rock Wool Board
Capacity 10000tons/year, 20000tons/year, 30000tons/year, 40000tons/year, 50000tons/year, 60000tons/year, 70000tons/year, 80000tons/year
Raw materials Basalt, dolomite, binders and so on
Main energy supply system
  • Raw coal energy supply system
  • Power energy supply system
  • Natural gas energy supply system
Frequently Asked Questions
Q: Where is the factory located?
A: We are located in Shijiazhuang, Hebei Province.
Q: What is your delivery time?
A: Usually, we make merchandise inventory. If we have the products in stock, the delivery time is 30-60 days after receiving the deposit. If we don't have the products in stock, we will arrange the production immediately, with delivery time of 1-3 months depending on order quantity.
Q: How can we ensure quality?
A: The final inspection is always carried out before shipment.
Q: How to install the equipment after purchasing?
A: Professional designing, manufacturing, installation and commissioning team. On-site installation and commission until the production of qualified products.
Q: Do you offer a guarantee?
A: Yes, we guarantee our product for one year. Provide after-sales service support with technical support.

Rock Wool Production Line with 1200-2400mm Length and Class A1 Fire Resistance Including Overseas Engineer Support

Send your message to this supplier
Send Now

Rock Wool Production Line with 1200-2400mm Length and Class A1 Fire Resistance Including Overseas Engineer Support

Ask Latest Price
Watch Video
Brand Name :
Greenson
Place of Origin :
HEBEI
MOQ :
1
Price :
US $2000000-4000000
Payment Terms :
L/C,T/T
Delivery Time :
90 days
Contact Supplier
video
Rock Wool Production Line with 1200-2400mm Length and Class A1 Fire Resistance Including Overseas Engineer Support
Rock Wool Production Line with 1200-2400mm Length and Class A1 Fire Resistance Including Overseas Engineer Support
Rock Wool Production Line with 1200-2400mm Length and Class A1 Fire Resistance Including Overseas Engineer Support
Rock Wool Production Line with 1200-2400mm Length and Class A1 Fire Resistance Including Overseas Engineer Support

Hebei Greens Building Material Technology Development Co.,Ltd

Verified Supplier
9 Years
hebei, shijiazhuang
Since 2013
Business Type :
Manufacturer
Total Annual :
5000000-8000000
Employee Number :
100~150
Certification Level :
Verified Supplier
Contact Supplier
Submit Requirement