Switch Mold For Automobile Electric Window Automotive Plastic Mould
Our advantage
1. Resonable price
2. Good after service
3. Experienced skilled workers and professional engineers
4. Good quality ,excellent service ,long life mould
5. On time delivery time
6. Send project schedule report and pictures to buyer to show the progress of the machineing.
7. Our international sales team work 24 hours per day to serve you



Product info
Name | high precision mould for car door switch / auto electric window switch mold making |
Mould material | SKD11, ASP-23,SKH9, SKD61,P20,NAK80,8402,8407 |
Mould base | LKM&Hasco&DME standard (A,B plate 1730,2311,2312,P20 ) |
Material main core and cavity insert | DIN2312,2738,2344,718,S136,8407,NAK80,SKD61 |
Cavity | Single / Multi per request |
Runner | Hot / Cold |
Mould life | 300,000-500,0000shots |
Maximum mould size | 1500*1500 mm |
surface request | EDM & High Polish |
Design software | UG,PROE,CAD etc. |
Faq
Q1. Which software do your designers use ? When can I get the quotation?
We use UG for designing,quotation will be provided in 2working days normally.
Q2. What is the lead time for mould?
Generally speaking, for the small moulds ( below 0.6M ), we need 4-5 weeks in total; 5-7 weeks for the moulds from 0.6M to 1M while we need 7-8 weeks for the moulds that are above 1.2M.
Q3. What is the payment terms of your company?
For mould,we require 40%deposit after confirm the order,30%after sample delivery.30%after mould approval before shipment. For production order:100% deposit.
Q4. How to ensure the mould lead time and quality?
We have a strict quality control system. It includes incoming quality check, in-process quality control, and tool buy-off quality assurance. We work closely with you from start to finish of each project. Once a week, will update the project status to customer with photos and detailed time planning.
Q5. What is the process if I want to put this order to you?
Well,After customer send the PO,I will send the customer the invoice,a 40% deposit payment is required the this stage ,we will make DFM report and discuss the technical issues with customer, and then start to do mold design. after receive the payment and customer confirm our design,we will start machining.