High Strength Metal Building Materials Construction Permanent Formwork High Ribbed Mesh
Product Specifications
| Attribute |
Value |
| Name |
High Strength Metal Building Materials Construction Permanent Formwork High Ribbed Mesh |
| Material |
Galvanized panel |
| Width |
0.45m |
| Length |
2m/2.5m |
| Thickness |
0.3mm/0.35mm/0.4mm |
| Feature |
Corrosion Resistance, Acid-resisting |
| Usage |
Interior/exterior |
| Surface treatment |
Hot Dipped Galvanized |
| Keyword |
Long life |
Product Description
Rib Lath is a versatile metal lath stiffened by longitudinal ribs. It features V ribs and greater tensile strength, offering an excellent plaster base and reinforcement for all types of walls, ceilings, partitions, and fireproofing of steel beams and columns. Rib lath provides a high degree of mechanical bonding with render or plaster.
High Ribbed Formwork consists of steel sheets formed into mesh with U pattern rib bone, creating a surface that bonds directly with concrete for subsequent pours without special treatment. This formwork is widely used in building construction for retaining walls, columns, stopends, construction joints, and slab flooring support. Manufactured from hot-dip galvanized steel sheet.
Technical Parameters
| Name |
Formwork Hot Dipped Galvanized Steel Sheets Rib Metal Lath |
| Width |
0.45m |
| Length |
2m/2.5m |
| Thickness |
0.3mm/0.35mm/0.4mm |
| Feature |
Easy to cut/Long life |
Applications
- Commercial office towers
- Apartment and residential high-rises
- Hospitals and healthcare facilities
- Hotels
- Car parks
- Industrial and warehouse facilities
- Shopping centers
Key Advantages
- Rapid Installation: Lightweight sheets are quickly laid across large areas by a small crew.
- No Stripping: As permanent formwork, it eliminates the time-consuming process of erecting, supporting, and stripping traditional timber formwork.
- Immediate Platform: Once installed, it provides a safe working surface, allowing subsequent trades to work immediately.
- Fast-Track Building: Enables the "top-down" construction method where multiple floors can be under construction simultaneously.
Services
- Online Technical Support
- Onsite Installation
- Onsite Training
- Onsite Inspection
- Free Spare Parts
- Return and Replacement
Frequently Asked Questions
Q1: Can I get free samples?
A: Yes, we have free samples available anytime.
Q2: What type of materials do you use for your products?
A: Carbon steel, galvanized plate.
Q3: Is there quality control on all production lines?
A: Yes, all production lines have adequate quality control.
Q4: What are your payment terms?
A: T/T 30% as deposit, and 70% balance before delivery. We'll show you videos of products and packages before final payment.
Q5: How about the delivery time?
A: Generally takes 15 days after receiving advance payment. Specific delivery time depends on items and order quantity.