Solar farms and ground mounted racking need thousands of shallow to medium piles across uneven terrain, fast. The HPR45-16 fixed mast rig with 45 kNm torque, 60 m/min main winch speed and 16 m depth capability drills anchor and rack foundation piles in a single pass, and the 2.9 m transport height keeps it moving between arrays on a standard low bed.
| Drilling Depth (Max) | 16 m |
| Drilling Diameter (Range) | 300~1000 mm |
| Kelly Bar (Size) | 245 x 4 x 4.5 m |
| Lateral Tilt Angle | 5° |
| Forward Tilt | 5° |
| Backward Tilt | 87° mast folding |
| Rotary Head Output Torque | 45 kNm |
| Rotation Speed | 7~40 rpm |
| Max Stroke | 1500 mm |
| Pressure Force | 45 kN |
| Lifting Force | 45 kN |
| Lifting Capacity | 45 kN |
| Main Winch Lifting Speed | 60 m/min |
| Main Winch Rope Diameter | 16 mm |
| Auxiliary Winch Lifting Force | 15 kN |
| Auxiliary Winch Lifting Speed | 40 m/min |
| Auxiliary Rope Diameter | 10 mm |
| Engine | Isuzu 4JG3X |
| Operating Weight | 12000 kg |
| Working Height | 8.2 m |
| Transport Height | 2.9 m |
| Transport Length | 6.9 m |
| Transport Width | 2.3 m |
| Excavator Chassis | SANY SY75C |
* Actual depth performance may differ due to soil condition, machine performance and operator skills.
Energy projects are measured in piles per day and cost per pile. High winch speed, 1500 mm stroke and a 45 kNm head keep cycle time down, and the compact transport envelope means the rig follows the array line instead of waiting for a crane.
Battery or hybrid drive configuration can be discussed for sites with strict emission limits.
APIE FOUNDATION EQUIPMENT (CHINA) LIMITED
Add: NO.108-4-1911 Huishan Avenue, Huishan Zone, Wuxi City, Jiangsu Province, China
Tel: +86-18921287030 | Fax: +86-510-83790757
E-mail: apie@apiepiling.com |