| project | Test Results | |||
| A Component | B Component | after mixing | ||
| Color and Viscosity | white paste | black paste | Black non-flowing paste | |
| proportion | 1.35 | 1.03 | 1.33 | |
| Main agent, catalyst by weight 12:1(Volume ratio 9:1)after mixing | ||||
| Construction time(ºC,50%RH) | 20-40minute | |||
| Dry time(ºC,50%RH) | 80-100minute | |||
| Corrosive | none | |||
| After curing - at temperature25ºC,7 days after construction at 50% relative humidity | ||||
| project | result | |||
| Hardness (Shore A) | 40 | |||
| 12.5%Tensile modulus at elongationMPa | 0.17 | |||
| ultimate tensile strengthMPa | 0.93 | |||
| Ultimate Elongation (Break) | 150% | |||