Specifications
Brand Name :
LionRock
Model Number :
All-in-one combined 40ft
Place of Origin :
Dongguan China
MOQ :
negotiate
Price :
negotiate
Payment Terms :
TT
Delivery Time :
negotiate
Packaging Details :
export packing
DCIM :
OwlEye
Container Dimensions :
12192 x 2438 x 2896
Container Weight (Fully Equipped) :
<25
Access Control :
Electronic lock with IC card reader
Working / Storage Temperature: °C :
-20 to 453 / -40 to 70
Protection Level :
IP55
Description

Container Dimensions Data Center , DCIM Modular Data Center Construction

Power Module1

The power module is a single ISO40HC container with four levels of power capacity that can be upgraded from the basic configuration to
480kW ICT load capacity in steps of 120kW each. Internal arrangement has been designed to allow the upgrade by installing additional power
equipment. Multiple Power Modules can be combined to support even high ICT load.

ICT Module1

Two ICT module designs are available to suit different cabinet depth. They can be combined in different configurations to meet various
operation requirements. Expansion is easy just by adding more modules. Combined with the Power module, there is always a configuration
that meet your requirement.

Container Dimension Data Center , DCIM Modular Data Center Construction

General Specifications

Fire Protection Type Automatic fire detection (smoke and heat) with
gas suppression system (HFC-227ea)
Monitoring and
Management
Access Control Electronic lock with IC card reader
Monitoring Video: Infrared IP cameras
Data: PDF, UPS, DC, A/C, Temp & Hum, fire protection, access control and ventilation
HMI Touch screen
Remote Access Web, App
Notification SMS, email
DCIM OwlEye
Structure Container Dimensions (W x D x H): mm 12192 x 2438 x 2896 (ISO40HC)
Container Weight (Fully Equipped): T <25
Protection Level IP552
Environmental
Conditions
Working / Storage Temperature: °C -20 to 453 / -40 to 70
Humidity: % 5 to 95
Altitude: m ≤4000 (derating start >1000)
Corrosion Class C (500m away from seashore)

Notes:

1 - Consult 3Tech for customized versions with Tier 3 reliability level or different ICT design load.

2 - Optional IP65 protection level.
3 - Optional maximum temperature up to 55°C.

Send your message to this supplier
Send Now

Container Dimension Data Center , DCIM Modular Data Center Construction

Ask Latest Price
Watch Video
Brand Name :
LionRock
Model Number :
All-in-one combined 40ft
Place of Origin :
Dongguan China
MOQ :
negotiate
Price :
negotiate
Payment Terms :
TT
Contact Supplier
video
Container Dimension Data Center , DCIM Modular Data Center Construction

3tech corporate limited

Active Member
6 Years
hong kong
Since 1998
Business Type :
Manufacturer, Exporter, Seller, Other
Employee Number :
300~400
Certification Level :
Active Member
Contact Supplier
Submit Requirement